Leading heavy machinery wear parts manufacturer and solutions provider since 1986.

Get a Quote

CASE STUDY / SUDAN

Bucket Teeth
Supply to Sudan

A construction machinery wear-part order, documented through shipment photographs and pre-dispatch inspection video.

Order value
US$40,000
Material
ZGMn13
Casting process
Resin-coated sand casting
Inspection plan
Level B

01 / PROJECT SCOPE

Project Scope &
Part References

Bucket teeth supplied for a customer in Sudan. The order covers the six drawing references listed here.

DRAWING REFERENCES (6)

  • ZL40.11.1-18B
  • Z3G.11.8I-5
  • 9F850-73C010007A0
  • 72A2499
  • LZ-50C-HD
  • LWC500K.36-8

02 / PRODUCTION & QUALITY CONTROL

Checks Before Dispatch

Review the order video and the inspection scope specified for this project.

Pre-dispatch Inspection FootageOpen inspection video

Order inspection record

Real pre-dispatch footage of the parts for this order. Use the player controls to review the video.

The Level B plan below defines the inspection items and sampling frequencies for this order.

100%

Visual inspection

Visual checks specified for every part.

10%

Sampling checks

Critical dimensions, individual part weight and MT / PT.

Heat / batch

Records & material checks

Composition and pouring by heat; heat treatment and other checks by the specified batch.

View Full Level B Inspection Plan

Level B is the inspection plan for this order. The following items define required checks and sampling frequencies, rather than measured results.

Raw material composition
Every heat
Melt composition
Every heat
Pouring records
Every heat
Visual inspection (VT)
100%
Critical dimensions
10%
Individual part weight
10%
Heat-treatment records
Every furnace batch
Hardness
Sampling from every heat-treatment batch
Magnetic particle / penetrant testing (MT / PT)
10%
Ultrasonic testing (UT)
Sampling when necessary
Mechanical properties
Every heat or agreed batch
Assembly fit
First article + sampling
Packaging
Every shipment batch

03 / PACKAGING & SHIPMENT

Packaging & Shipment

Packed wooden crates prepared for the Sudan order. The photograph records the packing before shipment.

Packed wooden crates prepared for the Sudan bucket teeth order
Shipment Record · Packed crates prepared for shipment

04 / FREQUENTLY ASKED QUESTIONS

Planning a Similar Order?

Send your drawing, sample or part reference so we can review the dimensions and mounting interface. The part specification and fit requirements are confirmed before production.

This Sudan order used ZGMn13 and resin-coated sand casting. For a new order, the material and manufacturing route are reviewed against the working conditions, part design and technical requirements.

Include the inspection items, sampling rates and acceptance criteria you require in your enquiry. The inspection plan is reviewed and agreed as part of the quotation and before production.

Provide the drawing or part reference, quantity, material requirements, working conditions and inspection requirements. Add a sample or mounting dimensions where the replacement fit needs to be checked.