Requirement review
Drawing revision, material grade, application, critical dimensions and document needs are identified before quotation.
QUALITY CONTROL
Inspection scope is matched to the drawing, material, application and procurement requirements. Checkpoints and required records can be agreed before an order enters production.

CONTROL PATH
Final inspection requirements depend on the part and purchase specification.
Drawing revision, material grade, application, critical dimensions and document needs are identified before quotation.
Material identity, production route, heat treatment and traceability requirements are defined for the project.
Dimensions, hardness, appearance and specified process checkpoints are recorded according to the agreed plan.
Quantity, marking, packing and required inspection documents are checked before shipment release.
INSPECTION SCOPE
Not every project requires the same inspection package. The applicable checks, acceptance criteria and document list should be confirmed against the drawing and order requirements.
PROJECT DOCUMENTATION
Document availability and format are confirmed project by project before production.
Drawing revision, material specification, inspection points and packing requirements.
Lot identification and agreed manufacturing or heat-treatment records where applicable.
Required dimensional, hardness, visual and quantity checks before packing.
Material certificates, third-party inspection and other documents agreed in the order.