Leading heavy machinery wear parts manufacturer and solutions provider since 1986.

Get a Quote

COMPLETE GREEN SAND FOUNDRY SOLUTION

Green Sand Casting Line

A project-configured production solution connecting return sand, sand preparation, molding, optional core handling, pouring, cooling, shakeout and the return sand loop.

Learn the Green Sand Casting Process
  • Single Machines
  • Section Solutions
  • Complete Lines
  • Custom Configuration
Sand Plant→Molding→Shakeout↺Return Sand

01 / COMPLETE LINE OVERVIEW

Build the foundry loop around the sand plant.

Green sand production is a connected route: prepared sand forms molds, molds receive metal, shakeout separates castings and used sand, and the return sand system feeds the next preparation cycle.

  1. 01Return SandSand flow
  2. 02Separation / ScreeningSand flow
  3. 03Sand CoolingSand flow
  4. 04New Sand / Additive DosingSand flow
  5. 05Mixing / MullingSand flow
  6. 06Prepared Sand StorageSand flow
  7. 07MoldingMold flow
  8. 08Core Setting (Optional)Mold flow
  9. 09Mold Closing / HandlingMold flow
  10. 10PouringCasting flow
  11. 11CoolingCasting flow
  12. 12ShakeoutCasting flow
  13. 13Casting SeparationCasting flow
  14. 14Return SandSand loop

Return sand closes the loop. Shakeout separates casting and used sand; the sand route can continue through metal or lump separation, screening, cooling or homogenizing, buffer storage and the sand plant.

Sand FlowMold FlowCasting Flow

02 / LINE SECTIONS

Start with the sand plant, then connect molding and the downstream loop.

Each section shows its role, inputs, outputs and configuration factors. Sections may be supplied individually or connected as one green sand foundry route.

01 / LINE SECTION

Sand Preparation & Conditioning

Role in the lineThe sand plant receives available sand streams, separates unwanted material, conditions return sand and prepares a controlled feed for molding.

Main equipment
  • Return Sand Conveyor
  • Metal Separation / Screening
  • Sand Cooler
  • Dosing System
  • Sand Mixer / Muller
  • Sand Testing / Control
  • Prepared Sand Hopper

Process connectionReturn sand is screened and cooled where required, then combined with new sand, bentonite, water or additives before mixing, testing and distribution.

Inputs → outputsReturn sand / new sand / additives → Prepared green sand

Configured based on project requirementsSand conditionDosing and moistureMixing / testing feedback
Explore Section
02 / LINE SECTION

Molding Section

Role in the lineThe selected molding method compacts prepared sand around the pattern and hands the formed mold to the next handling stage.

Main equipment
  • Vertical Flaskless Molding
  • Horizontal Flask Molding
  • Matchplate Molding
  • Other Green Sand Systems
  • Mold Handling System

Process connectionMolding equipment and mold handling are selected around the pattern, product mix, mold concept and project requirements.

Inputs → outputsPrepared green sand / pattern / mold handling → Formed mold ready for closing

Configured based on project requirementsMolding methodMold handling conceptLine interface
Explore Section
03 / OPTIONAL SECTION

Core Making & Setting

Role in the lineOptional — depends on internal casting geometry. A core route is included only when the casting requires an internal passage, hollow area or feature the pattern cannot form.

Main equipment
  • Core Shooter
  • Core Sand Preparation
  • Core Handling
  • Core Setting Station

Process connectionThe core section is reviewed as a project option and connected to mold closing only when the casting geometry and handling route require it.

Inputs → outputsCore sand / core geometry / formed mold → Mold with optional core

Configured based on project requirementsInternal geometryCore handlingClosing access
Explore Section
04 / LINE SECTION

Mold Handling & Pouring

Role in the lineTransfer, align and position molds for the selected pouring arrangement. Automatic pouring is a project option, not a default line assumption.

Main equipment
  • Mold Transfer
  • Alignment / Indexing
  • Melting Furnace
  • Holding Equipment — if applicable
  • Ladle Transfer
  • Automatic / Semi-automatic Pouring Unit

Process connectionMold handling, metal preparation and pouring are configured as connected handoffs around the casting, material and equipment scope.

Inputs → outputsFormed / closed mold and prepared metal → Poured mold

Configured based on project requirementsMold positioningPouring arrangementMetal handoff
Explore Section
05 / LINE SECTION

Cooling & Shakeout

Role in the lineMove poured molds through a cooling path and separate the casting, flask and used sand at shakeout without assuming a fixed cooling time.

Main equipment
  • Cooling Conveyor
  • Cooling Area / Buffer
  • Vibratory Shakeout
  • Cooling Drum / Separation System

Process connectionCooling, buffering and shakeout are balanced around handling space, casting condition and the downstream separation route.

Inputs → outputsPoured mold → Separated casting / used sand / flask

Configured based on project requirementsCooling pathBuffer / line balanceShakeout handoff
Explore Section
06 / LINE SECTION

Return Sand System

Role in the lineClose the green sand loop from shakeout back to the sand plant while keeping material separation, temperature management and buffer storage visible.

Main equipment
  • Sand Collection Conveyor
  • Metal / Lump Separation
  • Screening
  • Sand Cooler
  • Homogenizing / Buffer Hopper
  • Return Sand Conveyor

Process connectionThe return route connects shakeout, separation, screening, cooling or homogenizing and buffer storage before sand returns to preparation.

Inputs → outputsUsed sand / separated metal and lumps → Conditioned return sand to sand plant

Configured based on project requirementsContinuity of return sandTemperature managementBuffer / storage
Explore Section
07 / LINE SECTION

Cleaning & Finishing

Role in the lineRoute castings from shakeout to the finishing scope confirmed for the project. Each operation remains configurable and can be closed when outside the supplied scope.

Main equipment
  • Gate / Riser Removal
  • Shot Blasting
  • Grinding
  • Inspection

Process connectionFinishing is planned as a downstream handoff so casting handling, inspection and the line boundary remain clear.

Inputs → outputsSeparated castings → Cleaned / inspected castings

Configured based on project requirementsFinishing scopeCasting handlingInspection handoff
Explore Section

03 / CORE EQUIPMENT

Choose equipment by section role, not by an unverified fixed specification.

Representative equipment groups show where a technical discussion may begin. Final equipment, quantity and interfaces depend on casting, sand, molding and workshop requirements.

04 / LINE CONFIGURATION OPTIONS

Configure the supply scope around the project stage.

Choose a single machine, a connected section or a complete line. Automation level is configured by section and remains tied to the material, mold and casting route.

01 / SUPPLY SCOPE

Single Machine Supply

For a replacement, process addition or one-stage upgrade.

  • Manual support
  • Section interface

Start from the machine role, existing interface, utilities and project objective that are already known.

Discuss This Scope
02 / SUPPLY SCOPE

Section Solution

For sand preparation, molding, core, pouring, cooling & shakeout, return sand or finishing.

  • Manual support
  • Semi-automatic
  • Configured section

Define one coherent production section with its material handoff, controls and connection to adjacent stages.

Discuss This Scope

05 / CAPACITY & PROJECT INPUTS

Capacity is configured from project information, not a catalogue number.

Share what is already known. The engineering review translates inputs into sand plant decisions, molding and handling interfaces, return sand continuity and a workshop concept.

What We Need From You

  • +
    Casting Type

    Available information is enough to start the first project discussion.

  • +
    Material / Alloy

    Available information is enough to start the first project discussion.

  • +
    Casting Dimensions / Weight

    Available information is enough to start the first project discussion.

  • +
    Production Target

    Available information is enough to start the first project discussion.

  • +
    Molding Method Preference

    Available information is enough to start the first project discussion.

  • +
    Mold / Flask Requirement

    Available information is enough to start the first project discussion.

  • +
    Core Requirement

    Available information is enough to start the first project discussion.

  • +
    Existing Sand Plant / Molding Equipment

    Available information is enough to start the first project discussion.

  • +
    Workshop Size

    Available information is enough to start the first project discussion.

  • +
    Utilities

    Available information is enough to start the first project discussion.

  • +
    Automation Preference

    Available information is enough to start the first project discussion.

  • +
    Finishing Scope

    Available information is enough to start the first project discussion.

What We Configure

01
Sand plant arrangement

Configured based on process, workshop and project requirements.

02
Molding method and stations

Configured based on process, workshop and project requirements.

03
Core option and handling route

Configured based on process, workshop and project requirements.

04
Mold transfer / pouring interface

Configured based on process, workshop and project requirements.

05
Cooling and shakeout route

Configured based on process, workshop and project requirements.

06
Return sand continuity

Configured based on process, workshop and project requirements.

07
Automation direction

Configured based on process, workshop and project requirements.

08
Workshop layout

Configured based on process, workshop and project requirements.

CONFIGURED PER PROJECT

Production target, equipment sizing and final arrangement are confirmed after the available project inputs are reviewed.

06 / WORKSHOP LAYOUT & MATERIAL FLOW

Keep the sand loop visible while separating mold, metal and casting routes.

Reference Layout — final arrangement depends on project requirements.

RETURN SANDSAND PREPMOLDINGCORE OPT.MELTINGPOURINGCOOLINGSHAKEOUTSEPARATIONFINISHINGBUFFERRETURN LOOPREFERENCE LAYOUT / SAND · MOLD · CASTING FLOW
Sand FlowMold FlowCasting Flow
Layout zones01Return Sand Area02Sand Preparation Area03Molding Area04Core Room — Optional05Melting / Pouring06Cooling Route07Shakeout08Cleaning / Finishing09Utilities / Dust Collection — if involved
Send Your Workshop Layout

07 / AUTOMATION & CONTROL

Automation level is configured by section.

Focus on sand plant control, material handling, mold positioning, pouring integration, cooling balance, shakeout and plant monitoring rather than a generic unmanned-line claim.

01 / CONTROL LAYER

Sand Plant Control

Coordinate dosing, mixing, testing, prepared-sand storage and distribution around the selected sand route.

02 / CONTROL LAYER

Molding Automation

Connect sand delivery, pattern or mold handling and the selected molding machine by section.

03 / CONTROL LAYER

Optional Core Handling

Add core preparation and setting interfaces only when internal casting geometry requires them.

04 / CONTROL LAYER

Mold Handling

Coordinate transfer, alignment, indexing and positioning before the pouring handoff.

05 / CONTROL LAYER

Pouring Integration

Review manual, assisted or automatic pouring around the selected metal and mold interface.

06 / CONTROL LAYER

Cooling Balancing

Keep cooling path, buffer space and downstream shakeout handoffs visible in the line concept.

07 / CONTROL LAYER

Shakeout & Return Sand

Connect casting separation, screening, cooling, buffering and return sand movement.

08 / CONTROL LAYER

Plant Monitoring

Clarify signals, interlocks and operating conditions between connected equipment groups.

08 / ENGINEERING & PROJECT DELIVERY

Move from requirement review to a defined line scope.

Delivery stages are a framework. Installation, commissioning, training and ongoing support are confirmed around the supplied project scope and site conditions.

  1. 01 / STEP

    Casting & Requirement Review

    Review the available part information, project objective and existing conditions.

    Client input
    Casting type, material and production target
    Deliverable
    Initial requirement list
  2. 02 / STEP

    Sand System Review

    Map the sand streams, conditioning needs and available sand plant interfaces.

    Client input
    Return sand, new sand and preparation information
    Deliverable
    Sand system framework
  3. 03 / STEP

    Molding Method Selection

    Compare the configured green sand molding options for the project route.

    Client input
    Pattern, mold / flask needs and product mix
    Deliverable
    Molding direction
  4. 04 / STEP

    Equipment Configuration

    Define equipment groups, supply boundaries and section interfaces.

    Client input
    Required sections and existing equipment
    Deliverable
    Equipment scope
  5. 05 / STEP

    Workshop Layout

    Place sand, mold, metal, cooling, shakeout, finishing and return routes.

    Client input
    Workshop dimensions, access and utilities
    Deliverable
    Reference layout
  6. 06 / STEP

    Manufacturing

    Coordinate the agreed equipment work and project interfaces.

    Client input
    Approved supply scope
    Deliverable
    Manufacturing progress information
  7. 07 / STEP

    Installation & Commissioning

    Discuss project-specific installation, commissioning and handover needs.

    Client input
    Site readiness and project contacts
    Deliverable
    Commissioning plan
  8. 08 / STEP

    Training / After-sales

    Define support around the supplied scope and operating handoff.

    Client input
    Operator and maintenance needs
    Deliverable
    Support scope

09 / FAQ + RELATED RESOURCES

Questions to settle before an engineering review.

These answers keep the conversation focused on the sand plant, molding, material flow, project inputs and delivery planning.

A line may include return sand handling, separation and screening, sand cooling, dosing, mixing or mulling, testing, prepared-sand storage, a molding system, optional core equipment, mold handling, pouring, cooling, shakeout, casting separation and finishing. Final scope is configured from the project inputs.

10 / FINAL RFQ

Request a Green Sand Casting Line Proposal

Share the casting, sand, workshop and project information already available. The first review identifies the line scope, configuration questions and next technical inputs.

  • Project-configured scope
  • Single machine, section or complete line
  • Drawings and plant layouts welcome
Requirement → Configuration → Proposal
YOUR PROJECT

Fields marked * are required.

Online submission currently accepts text only. Files can be discussed after the initial inquiry.

Your information will only be used to respond to your inquiry. Privacy Policy.

CUSTOM FOUNDRY ENGINEERING

Need a custom line configuration?

Discuss process, sand system, equipment scope and factory conditions as one project.

Discuss Your Project